

This
Plan is in the process of being updated.
Click here for details.
2005
EL DORADO COUNTY
BICYCLE TRANSPORTATION PLAN
On January 25, 2005 the El Dorado County Board of Supervisors adopted the 2005 El Dorado County Bicycle Transportation Plan. As a result, El Dorado County is eligible to apply for grants funded by the Statewide Bicycle Transportation Account which is annually funded at $7.2 million.
The plan provides a blueprint for the development of a bicycle transportation system on the western slope of El Dorado County. The plan updates the currently adopted El Dorado County Bicycle Master Plan, which was adopted in May 1979.
The Plan can be downloaded (see left) or viewed during business hours at the EDCTC office. Copies are available for purchase through the El Dorado County Planning Department, 2850 Fairlane Court, Placerville, CA.
Download
the 2005 El Dorado County Bicycle Transportation Plan
(items over 500 kb are noted)
The
Complete Plan (6.7 mb)
(or download in smaller sections below)
Cover
Page (2.9 MB)
Acknowledgements
Chapter 2: Bicycle Transportation Analysis
Chapter 3: Goals and Objectives
Chapter 4: Existing Conditions (599 kb)
Chapter 5: Proposed Improvements
MAPS
for Chapter 5:
El
Dorado Hills
Cameron
Park/Shingle Springs
Latrobe
Area
El
Dorado/Diamond Springs
Camino/Pollock
Pines
Georgetown/Cool/Coloma
Chapter
6: Bikeway Network
Implementation Strategy
Appendices: